The project consists in the hydroelectric development of a section of the Conquil River, near the town of Panguipulli, in the Chilean region of Los Ríos, through two hydroelectric power plants of 4.8 and 2.4 MW.
ERH Consult is responsible for engineering support throughout the processing process. The project involves the annual average generation of 25.7 GWh/year, which implies a reduction of emissions to the atmosphere of 12,850 Tn of CO2. The project has been designed from the point of view of sustainability in all areas of action, complying scrupulously with environmental regulations.