At the point of restitution between the canal and the river, it is necessary to construct a stilling basin that avoids the undercutting of the natural riverbed.
The maximum flow is 22 m³/s and the level difference is 15 m, which involves dissipating an energy of approximately 3 MW.
TASK
Hydraulic project and supervision of the construction of a stilling basin for 22 m³/s and 15 m of unevenness.