Both plants have a conventional intake, open channel, forebay, penstock and power house. The upper plant is equipped with a Pelton turbine with vertical axis, while the lower one has two horizontal Francis.
TASKS
- Feasibility studies
- Engineering to support Environmental permits
- Other permits projects
- Detail engineering
- Construction management and supervision
- Commissioning