The project involved the installation design of a system of submerged grids installed on the back-dam, modification of the connecting pipe in the body dam, installation of a bureau valve for closing the circuit, installation of the penstock of 45 m-length and the construction of the power house, electromechanical equipment and electrical facilities.
The design flow of the plant is 5.0 m³/s, with a gross head of 47.4 m and an installed capacity of 2 MW, equipped with two Francis turbines with horizontal axis. The voltage network is 25 kV.
TASKS
Basic and concessional projects, construction project and supervision of works.
(*) Project carried out by the ERH partners